You are here:Home > About Chenzhou > City Facts > Transportation
A  |  A  |  A

Three Highways Greening Upgrade Project to be Fulfilled in April

2013-03-13

 

An investigation team organized by Chenzhou government took a survey for the greening upgrade work of Guijia road, Linjia road and S214 road. A schedule meeting was followed the survey to present the special arrangement of the greening work.

 

There are about 260kms for the three highways mentioned above which pass through 4 counties of Chenzhou city. Though great achievements were reached in the greening work of the three highways, the greening task of 2013 is even tougher.

 

As required in the schedule meeting, 3 lines of 10-15 meter-long greening belt should be planted in the sides of the three highways. All these greening upgrade tasks should be fulfilled in this April. At the meantime, special attention should be paid to forest fire prevention with detailed work measures, enhanced schedule, stronger supervision and strengthened evaluation and accountability.

 

Lei Xiaoda- Deputy Mayor of Chenzhou City attended the meeting.