Comprehensive Treatment and Development of Tailings Heavy Metal Pollution of Ganxi River

2011-04-22

 

Project Initiator: Chenzhou Municipal Bureau for Environment Protection

 

Zip Code: 423000

 

Project Content:

1. The construction begins at Ganxiping, the source of Ganxi River, in the first stage of construction, 7km watercourse will be dredged up by enclosing and embanking, and 56,700,000m3 tailings will be solidified.

 

2. Combined with the watercourse dredging up and tailings solidification, set up several tailing enrichment subsidiary plants along the river by echelon to form the solidifying capacity of 10,000t/d tailings when or after the enrichment of heavy metals.

 

3. Construct two concentration plants for comprehensive recycling of 2000t/d tin, lead, zinc, sulfur, iron and arsenic from tailings after the enrichment.

 

4. Construct a plant with smelting capacity of 3000t/a fine tin from tin concentrates.

The above construction will be carried out by stages. Item 1, 2, 3 will be carried out in the first stage and Item 4 will be carried out in the second stage.

 

Total Investment: USD 88.62 million

 

Cooperation Forms: equity joint venture, contractual joint venture

 